Source - LSE Regulatory
RNS Number : 8078Y
Ecora Resources PLC
01 August 2024
 

 

 

1 August 2024

 

Ecora Resources PLC

("Ecora" or the "Group")

 

Santo Domingo Update

 

Ecora Resources PLC (LSE/TSX: ECOR) notes the press release issued by Capstone Copper Corp ("Capstone") on 31 July 2024 regarding the publication of an updated Feasibility Study ("FS") on the Santo Domingo project, over which Ecora holds a 2% Net Smelter Return royalty. The Group's royalty area includes the highest copper grade portion of the deposit, expected to be mined during the initial 6 to 7 years of production.1

 

Key highlights from the Feasibility Study include:

 

·     The 2024 FS outlines a robust copper-iron-gold project with an after-tax net present value at an 8% discount rate of $1.7 billion and an after-tax internal rate of return of 24.1%

·     Over the first seven years of the mine plan, production is expected to average 106,000 tonnes of copper and 3.7 million tonnes of iron concentrate at first quartile cash costs of $0.28 per payable pound of copper produced

Over the Project's 19-year mine life, production is expected to average 68,000 tonnes of copper and 3.6 million tonnes of iron concentrate at first quartile cash costs of $0.33 per payable pound of copper produced

·     Total initial capital cost of $2.3 billion drives a capital intensity of approximately $21,900 per tonne of annual copper equivalent production over the life of mine

·     A 19-year mine life is supported by a higher Mineral Reserve2 estimate of 436 million tonnes at a copper grade of 0.33%, iron ore grade of 26.5%, and a gold grade of 0.05 grams per tonne

Mineral Reserve tonnes have increased by 11% while contained copper has increased by 23% since the 2020 Feasibility Study

·     The updated Santo Domingo 2024 FS was prepared by Ausenco, a multinational engineering, procurement, construction management, and operations service provider with broad international experience in the design and construction of concentrator projects of this scale. Ausenco was specifically responsible for the construction of Capstone's nearby Mantoverde Development Project

1 Based on the 2020 Feasibility Study available on SEDAR, as per Capstone Copper news release dated 24 March 2020, "Capstone Files Technical Report for Santo Domingo Project"
2 Comprised of 131 million tonnes in the Proven category and 305 million tonnes in the Probable category.

 

The full Capstone press release can be found here:

https://capstonecopper.com/news/capstone-announces-updated-santo-domingo-feasibility-study-building-a-world-class-district-in-chile/

 

A virtual tour of Santo Domingo and the Mantoverde-Santo Domingo district can be found here: https://youtu.be/n-FyVJ9t2JE

 

Capstone has stated that a National Instrument 43-101 ("NI 43-101") Technical Report will be prepared to summarize the results of the 2024 Feasibility Study by the Qualified Persons and will be filed on SEDAR+ at www.SEDAR.com, within 45 days of the news release issued yesterday.

 

For further information

 

Ecora Resources PLC

+44 (0) 20 3435 7400

Geoff Callow - Head of Investor Relations




Website: 

www.ecora-resources.com



FTI Consulting

Sara Powell / Ben Brewerton / Nick Hennis

 

+44(0) 20 3727 1000

ecoraresources@fticonsulting.com

About Ecora Resources

 

Ecora Resources is a leading royalty company focused on supporting the supply of commodities essential to creating a sustainable future.

 

Our vision is to be globally recognised as the royalty company of choice synonymous with commodities that support a sustainable future by continuing to grow and diversify our royalty portfolio in line with our strategy. We will achieve this through building a diversified portfolio of scale over high quality assets that drives low volatility earnings growth and shareholder returns. 

 

The mining sector has an essential role to play in the energy transition, with commodities such as copper, nickel and cobalt - key materials for manufacturing batteries and electric vehicles. Copper also plays a critical role in our electricity grids. All these commodities are mined and there are not enough mines in operation today to supply the volume required to achieve the energy transition.

 

Our strategy is to acquire royalties and streams over low-cost operations and projects with strong management teams, in well-established mining jurisdictions. Our portfolio has been reweighted to provide material exposure to this commodity basket and we have successfully transitioned from a coal orientated royalty business in 2014 to one that by 2026 will be materially coal free and comprised of over 90% exposure to commodities that support a sustainable future. The fundamental demand outlook for these commodities over the next decade is very strong, which should significantly increase the value of our royalty portfolio.

 

Ecora's shares are listed on the London and Toronto Stock Exchanges (ECOR) and trade on the OTCQX Best Market (OTCQX: ECRAF).

 

Cautionary statement on forward-looking statements and related information

Certain statements in this announcement, other than statements of historical fact, are forward-looking statements based on certain assumptions and reflect the Group's expectations and views of future events. Forward-looking statements (which include the phrase 'forward-looking information' within the meaning of Canadian securities legislation) are provided for the purposes of assisting readers in understanding the Group's financial position and results of operations as at and for the periods ended on certain dates, and of presenting information about management's current expectations and plans relating to the future. Readers are cautioned that such forward-looking statements may not be appropriate other than for purposes outlined in this announcement. These statements may include, without limitation, statements regarding the operations, business, financial condition, expected financial results, cash flow, requirement for and terms of additional financing, performance, prospects, opportunities, priorities, targets, goals, objectives, strategies, growth and outlook of the Group including the outlook for the markets and economies in which the Group operates, costs and timing of acquiring new royalties and making new investments, mineral reserve and resources estimates, estimates of future production, production costs and revenue, future demand for and prices of precious and base metals and other commodities, for the current fiscal year and subsequent periods.

 

Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as 'expects', 'anticipates', 'plans', 'believes', 'estimates', 'seeks', 'intends', 'targets', 'projects', 'forecasts', or negative versions thereof and other similar expressions, or future or conditional verbs such as 'may', 'will', 'should', 'would' and 'could'. Forward-looking statements are based upon certain material factors that were applied in drawing a conclusion or making a forecast or projection, including assumptions and analyses made by the Group in light of its experience and perception of historical trends, current conditions and expected future developments, as well as other factors that are believed to be appropriate in the circumstances. The material factors and assumptions upon which such forward-looking statements are based include: the stability of the global economy; the stability of local governments and legislative background; the relative stability of interest rates; the equity and debt markets continuing to provide access to capital; the continuing of ongoing operations of the properties underlying the Group's portfolio of royalties, streams and investments by the owners or operators of such properties in a manner consistent with past practice; no material adverse impact on the underlying operations of the Group's portfolio of royalties, streams and investments from a global pandemic; the accuracy of public statements and disclosures (including feasibility studies, estimates of reserve, resource, production, grades, mine life and cash cost) made by the owners or operators of such underlying properties; the accuracy of the information provided to the Group by the owners and operators of such underlying properties; no material adverse change in the price of the commodities produced from the properties underlying the Group's portfolio of royalties, streams and investments; no material adverse change in foreign exchange exposure; no adverse development in respect of any significant property in which the Group holds a royalty or other interest, including but not limited to unusual or unexpected geological formations and natural disasters; successful completion of new development projects; planned expansions or additional projects being within the timelines anticipated and at anticipated production levels; and maintenance of mining title.

 

Forward-looking statements are not guarantees of future performance and involve risks, uncertainties and assumptions, which could cause actual results to differ materially from those anticipated, estimated or intended in the forward-looking statements. Past performance is no guide to future performance and persons needing advice should consult an independent financial adviser. No statement in this communication is intended to be, nor should it be construed as, a profit forecast or a profit estimate.

 

By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate; that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved.

 

A variety of material factors, many of which are beyond the Group's control, affect the operations, performance and results of the Group, its businesses and investments, and could cause actual results to differ materially from those suggested by any forward-looking information. Such risks and uncertainties include, but are not limited to current global financial conditions, royalty, stream and investment portfolio and associated risk, adverse development risk, financial viability and operational effectiveness of owners and operators of the relevant properties underlying the Group's portfolio of royalties, streams and investments; royalties, streams and investments subject to other rights, and contractual terms not being honoured, together with those risks identified in the 'Principal Risks and Uncertainties' section of our most recent Annual Report, which is available on our website. If any such risks actually occur, they could materially adversely affect the Group's business, financial condition or results of operations. Readers are cautioned that the list of factors noted in the section herein entitled 'Risk' is not exhaustive of the factors that may affect the Group's forward-looking statements. Readers are also cautioned to consider these and other factors, uncertainties and potential events carefully and not to put undue reliance on forward-looking statements.

 

The Group's management relies upon this forward-looking information in its estimates, projections, plans and analysis. Although the forward-looking statements contained in this announcement are based upon what the Group believes are reasonable assumptions, there can be no assurance that actual results will be consistent with these forward-looking statements. The forward-looking statements made in this announcement relate only to events or information as of the date on which the statements are made and, except as specifically required by applicable laws, listing rules and other regulations, the Group undertakes no obligation to update or revise publicly any forward-looking statements, whether as a result of new information, future events or otherwise, after the date on which the statements are made or to reflect the occurrence of unanticipated events.

 

This announcement also contains forward-looking information contained and derived from publicly available information regarding properties and mining operations owned by third parties.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEANPFEDKLEEA
Find out how to deal online from £1.50 in a SIPP, ISA or Dealing account. AJ Bell logo

Related Charts

Ecora Resources PLC (ECOR)

0p (0.00%)
delayed 17:30PM